Countryside was appointed to carry out remedial works to a damaged kerb line and adjacent footpath at the Church & Dwight site. The works included excavation of the existing damaged kerbing and footway, followed by the installation of new kerbs.

To improve durability and protect against future HGV overrun, the kerb line was strengthened using C30 concrete. The project was completed with the construction of a new tarmac footway, delivering a robust, safe, and long-lasting finish suitable for heavy-use areas.