ExCeL London

Countryside Group Ltd - Excel London

Summary

Working with Walker Construction at the London Excel Centre was an absolute pleasure for our team. Our brief was to create a new site access and implement traffic management, including a temporary pedestrian footpath. We were committed to delivering top-quality service and ensuring complete client satisfaction.

The project began with excavating the existing footpath down to the road formation level and carefully removing the existing drainage kerb tops, leaving them in the channel. We then supplied and installed 12mm steel plates over the drainage channel, followed by the installation of Terram 1000 and Tensar TX160 geogrid for added stability.

Next, we installed new drop kerbs and leveled and compacted the new Type 1 formation. Our team then laid a 20mm base course of tarmac, finished with a 10mm wearing course to ensure a smooth, durable surface. Every stage of the project was completed to the highest standards, with attention to both quality and safety.

The client was extremely pleased with the final result, and we were thrilled to have exceeded their expectations. We take immense pride in our work and are committed to providing the best possible service on every project. This was a rewarding experience, and we look forward to tackling more challenging projects in the future.

Location

2023

Client

London

Completion Year

Walker Construction

Countryside Group Ltd - Excel London
Countryside Group Ltd - Excel London

CALL OUR FRIENDLY TEAM: 01233 510699

  • LinkedIn
  • Facebook
  • Instagram
  • Twitter
bottom of page